Skip to main content
ACE Group

Chukwani Mixed-Use Building

8-floor mixed-use

Construction of an eight-floor mixed-use building in Chukwani, Zanzibar, with reinforced-concrete slabs and columns progressing on site.

Reinforced-concrete slab and column formwork on the ongoing eight-floor mixed-use building in Chukwani, Zanzibar
Ongoing structural works in Chukwani, with cast columns and timber formwork for the next pour.
Project type
Commercial
Location
Chukwani, Zanzibar
Status
Ongoing
Discuss a similar project

01 / Project overview

The project at a glance

This ongoing mixed-use project in Chukwani is planned as an eight-floor building. Active structural work includes cast floor slabs and columns, with further columns still in timber formwork and bracing while vertical construction continues.

Architectural ServicesCivil and Structural EngineeringMechanical, Electrical and PlumbingFurniture and Interior Design

02 / Challenge

Project challenge

Deliver an eight-floor mixed-use building while successive slab and column stages continue on an active structural site.

03 / ACE Group solution

A coordinated response

ACE Group supports the project through architectural, civil and structural, MEP, and furniture and interior design disciplines working as one coordinated delivery conversation.

04 / Scope of work

Verified project scope

  • 01

    Eight-floor mixed-use construction

  • 02

    Reinforced-concrete frame

  • 03

    Architectural coordination

  • 04

    Civil and structural engineering

  • 05

    Mechanical, electrical and plumbing

  • 06

    Furniture and interior design

06 / Similar-project enquiry

Planning a Project With Similar Requirements?

Share the requirements for your project through the structured quote request.